| |
|
|
| View looking out to the Fraser
River in the distance through windows and porch scaffolding,
shows interior walls insulated, sealed with vapor barrier
and ready for drywall. |

|
| Drywall interior roof, ready for mudding
and sanding. |

|
| Framing the firplace. |

|
| Here's a look at an interior wall after
mudding and sanding is complete. It's now ready
for paint, wall paper or other finishing application.
|

|
| Moving outside, we see the stucco
that has been applied on an exterior wall. Of course,
prior to any spraying or painting, all wood was carefully
masked off with tape and paper, to
protect the natural beauty of the wood beams and pilars. |

|
Posts are sealed wherever necessary for
weather proofing, or where a smooth
finished look is desired. This first image shows
the sealing placed from log to stucco ... |

|
| ... and the second image demonstrates sealing
between intersecting posts. |

|
A very dusty picture,
showing finish sanding of the logs themselves. |
 |
|
|
More coming ....!
Previous | Next Page 
|
|
|
|
|
|