| Perimeter walls are sealed tight
to the outside weather by placing sill-gaskets underneath the
base of the wall. |

|
| Insulation is placed between each log to eliminate
any possible drafts. |

|
| Main walls shown here are now ready for the
second floor. |

|
| Roof posts are placed by the crane truck.
|

|
| The ridge post. Visible to the inside,
this strong central log creates a stunning inside view overhead,
that spans the width of the home. |

|
The roof takes shape. |

|
| Next stage, get the roof on and prepare for
lockup. Now we're getting excited :-) |

|
|
|